EasyManua.ls Logo

Eaton Box 1 - Reset Rod Installation

Eaton Box 1
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17
Instructions and Operation P52899
Effective July 2019
Box 1 and Box 2 non-combination enclosed
control and C600M cover control kit wiring
EATON www.eaton.com
Reset rod installation
1. From the top of the box cover, insert the M22 button into the
box cover.
2. From the bottom of the cover, tighten the nut onto M22 button.
3. From the bottom of the cover, snap the shroud (if supplied) cut
to the appropriate length for the reset rod into the M22 button.
4. If the reset paddle is not already assembled to the required reset
rod (see Reset rod kits table on previous page), assemble as
shown by inserting reset rod into reset paddle.
5. From the bottom of the cover, snap the required reset rod into
M22 button. The flat side of the paddle should face away from
the box cover’s rectangular opening with the
6. “Up” arrow facing toward the top of the box.

Related product manuals