Eaton 30 kVA Mini Power Distribution Unit Installation and Operation Manual 164001117—Rev 01 5
CChhaapptteerr 22 SSaaffeettyy
Follow safe electrical work practices:
• Severe or fatal injury can result from electrical shock during contact with high voltage conductors,
monitoring PCBs, or similar equipment.
• Disconnect power before drilling holes, attaching conduit, and attaching other power distribution
equipment.
• Disconnect and lock-out all power supplying equipment before working on or installing components.
• Use a properly rated voltage sensing device to confirm power is OFF.
• Leave ample space for attaching and routing wires.
• Use Lock Out/Tag Out procedures.
• Wear suitable personal protective clothing and use protective equipment for performing mechanical and
electrical installations.
• Install equipment in an appropriate electrical environment per local regulations.
• Disconnect and lock-out all power supplying equipment before working on or installing components. Use a
properly rated voltage sensing device to confirm power is OFF.