19
Instruction Manual IB015002EN
Effective November 2021
Pow-R-Line CS switchboards
EATON www.EatonCanada.ca/PRLCS
Table 3. Initial insulation resistance test record
Date
All overcurrent devices open
Phase to Phase Connections Phase-to-ground connections Neutral-ground
connection
A-B A-C B-C A—Ground B—Ground C—Ground
Date
All overcurrent devices closed
Phase-to-phase connections Phase-to-ground connections Neutral-ground
connection
A-B A-C B-C A—Ground B—Ground C—Ground
Notes:
Date
All overcurrent devices open
Phase-to-phase connections Phase-to-ground connections Neutral-ground
connection
A-B A-C B-C A—Ground B—Ground C—Ground
Date
All overcurrent devices closed
Phase-to-phase connections Phase-to-ground connections Neutral-ground
connection
A-B A-C B-C A—Ground B—Ground C—Ground
Notes:
Date
All overcurrent devices open
Phase-to-phase connections Phase-to-ground connections Neutral-ground
connection
A-B A-C B-C A—Ground B—Ground C—Ground
Date
All overcurrent devices closed
Phase-to-phase connections Phase-to-ground connections Neutral-ground
connection
A-B A-C B-C A—Ground B—Ground C—Ground
Notes:
Date
All overcurrent devices open
Phase-to-phase connections Phase-to-ground connections Neutral-ground
connection
A-B A-C B-C A—Ground B—Ground C—Ground
Date
All overcurrent devices closed
Phase-to-phase connections Phase-to-ground connections Neutral-ground
connection
A-B A-C B-C A—Ground B—Ground C—Ground
Notes:
Table 4. Switchboard inspection log
Date Checklist ✓ Notes and actions taken
Cleaning
Bus and cable connections
Insulation inspection
Overcurrent device inspection
Meters
Controllers
Surge protective devices
Other protective devices
Secondary/control wiring
Clean ventilation
Date Checklist ✓ Notes and actions taken
Cleaning
Bus and cable connections
Insulation inspection
Overcurrent device inspection
Meters
Controllers
Surge protective devices
Other protective devices
Secondary/control wiring
Clean ventilation
Date Checklist ✓ Notes and actions taken
Cleaning
Bus and cable connections
Insulation inspection
Overcurrent device inspection
Meters
Controllers
Surge protective devices
Other protective devices
Secondary/control wiring
Clean ventilation
ote: N Refer to the “Maintenance” section on page 16.