Table 3. Initial insulation resistance test record
Date
All overcurrent devices open
Phase to Phase Connections Phase-to-ground connections Neutral-ground
connection
A-B A-C B-C AGround BGround CGround
Date
All overcurrent devices closed
Phase-to-phase connections Phase-to-ground connections Neutral-ground
connection
A-B A-C B-C AGround BGround CGround
Notes:
Date
All overcurrent devices open
Phase-to-phase connections Phase-to-ground connections Neutral-ground
connection
A-B A-C B-C AGround BGround CGround
Date
All overcurrent devices closed
Phase-to-phase connections Phase-to-ground connections Neutral-ground
connection
A-B A-C B-C AGround BGround CGround
Notes:
Date
All overcurrent devices open
Phase-to-phase connections Phase-to-ground connections Neutral-ground
connection
A-B A-C B-C AGround BGround CGround
Date
All overcurrent devices closed
Phase-to-phase connections Phase-to-ground connections Neutral-ground
connection
A-B A-C B-C AGround BGround CGround
Notes:
Date
All overcurrent devices open
Phase-to-phase connections Phase-to-ground connections Neutral-ground
connection
A-B A-C B-C AGround BGround CGround
Date
All overcurrent devices closed
Phase-to-phase connections Phase-to-ground connections Neutral-ground
connection
A-B A-C B-C AGround BGround CGround
Notes:
Table 4. Switchboard inspection log
Date Checklist Notes and actions taken
Cleaning
Bus and cable connections
Insulation inspection
Overcurrent device inspection
Meters
Controllers
Surge protective devices
Other protective devices
Secondary/control wiring
Clean ventilation
Date Checklist Notes and actions taken
Cleaning
Bus and cable connections
Insulation inspection
Overcurrent device inspection
Meters
Controllers
Surge protective devices
Other protective devices
Secondary/control wiring
Clean ventilation
Date Checklist Notes and actions taken
Cleaning
Bus and cable connections
Insulation inspection
Overcurrent device inspection
Meters
Controllers
Surge protective devices
Other protective devices
Secondary/control wiring
Clean ventilation
ote: N Refer to the “Maintenance” section on page 16.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Eaton Pow-R-Line CS and is the answer not in the manual?

Eaton Pow-R-Line CS Specifications

General IconGeneral
BrandEaton
ModelPow-R-Line CS
CategorySwitch
LanguageEnglish

Related product manuals