22
This manual is the intellectual property of Ecoso. Copying and reprinng is prohibited. © 2024
INSTALLATION AND OPERATION GUIDELINES FOR REVERSE OSMOSIS SYSTEMS ECOSOFT ROBUST MINI,
ROBUST 1500, ROBUST PRO, ROBUST 3000, ROBUST 3000MAX, ROBUST 4000
Start rinsing pre–lters: open a special rinse valve and pass the required volume of water
to the bucket unl there are no carbon nes in rinsewater.
9
Install all membranes in membrane housings.
CAUTION!
10
Open feed valve and puried water faucet for 30 minutes to rinse membranes and other
parts of the system. Do not open tank valve at this me. Close the puried water faucet and
check all connecons for leaks.
CAUTION!
11
Insert the post-lter into housing and screw it. For RObustPro system insert special
RObustPro lter and post-lter into the housings and screw them.
Open the water supply and puried water faucet for 5-10 minutes to rinse the carbon lter.
Open tank valve and let the system ll it. Open puried water faucet and discard the rst
tank of puried water. When the tank is drained empty, close the puried water faucet and
let the system rell the tank. The water can be used now.
* Skip steps 4 and 12 if installing a tankless system.
* Skip if using a tankless system.
1. Use calibrated TDS meter to test your tap water and puried water total dissolved solids.
2. Verify proper funconing of feed water solenoid. The system must switch o and stop discharging
concentrate when pressure tank is full* and puried water faucet is closed.
3. Inspect the system carefully for leaks.
4. Make a record of system installaon in maintenance log paragraph 9.
5. *Operaon with the pressure tank. When the tank is full, the pump is switched o and the drain stop.
6. If the operang pressure is higher than 7 bar aer turning on the system, you need to regulate the
bypass on the pump and set the pressure to 6-7 bar as shown
in the picture.
Bypass regulaon counterclockwise - pressure decreases, clockwise - pressure increases.
The size of the allen screwdriver is 2.5 mm.
A