Do you have a question about the ECR Dunkirk PVWB-5D and is the answer not in the manual?
Details on providing adequate combustion and ventilation air, including methods and standards.
Procedure for installing the safety relief valve and its discharge piping to prevent scalding.
Specifications for connecting the boiler to gas vents or chimneys, including sizing and condition.
Instructions for installing the vent damper and connecting it to the flue outlet collar.
Guidelines for selecting the correct gas pipe size and connecting the piping to the boiler.
Critical safety warnings regarding gas leak detection and handling potential fire hazards.
Requirements for the electrical power supply, circuit, and proper grounding of the boiler.
Schematic showing the electrical connections for intermittent ignition systems.
Schematic illustrating the electrical connections for standing pilot ignition systems.
Crucial safety precautions, including what to do if gas is smelled, and handling controls.
Step-by-step instructions for operating boilers with intermittent ignition systems.
Procedures for checking burners and testing the safety relief valve.