EasyManuals Logo

EKF Diagnostics Biosen C-Line GP+ User Manual

Default Icon
123 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #47 background imageLoading...
Page #47 background image
Shutdown
User Manual Biosen C_line Clinic / GP+
43
11. Shutdown
11.1 Brief separation from the mains (<72h)
For shipment or transport, the device can be separated from the mains
for a maximum period of 72 hours without additional action.
The bottles for system solution and waste must be
emptied. All micro test tubes must be removed.
11.2 Longer separation from the mains (>72h)
If the device is not used for just some days, it should be put into stand-
by mode. A disconnection from the mains supply is only recommended
if the device will not be used for an extended period (more than
four weeks).
Empty the whole flow system using the menu item Emptying System
(9.10.2, page 38). The bottles for system solution and waste must be
emptied, as well as the sample and special positions. Then remove the
chip sensor(s) as described in Section 5.2.3.2, page 16.
Hang out the pump tube in the following way:
Open pump flap (turn up from
right to left).
Grab the pump tube, preferably
with a rounded pair of tweezers,
and unhook from the pump wheel.
Figure 24 - Hang out pump tube
Then close the pump flap again.
The tube must not be completely
removed.
Figure 25 - Pump tube externally hung
Finally, separate the device from the mains.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the EKF Diagnostics Biosen C-Line GP+ and is the answer not in the manual?

EKF Diagnostics Biosen C-Line GP+ Specifications

General IconGeneral
BrandEKF Diagnostics
ModelBiosen C-Line GP+
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals