7) Measurement Start
By clicking the [Start] button on the “Measure” tab, the measurement will start and [Measurement Status
Display] is indicated as “Measuring”. The measurement will stop when [Stop] button is clicked.
After the measurement is completed, below graph is displayed.
8) Loading Data
After taking a measurement only by using the MP-11 Main
Unit and while the MP-11 Main Unit and the PC are
connected with USB cable, the measured data can be
downloaded to the PC software from the MP-11 Main Unit
memory by clicking the [Load Data] button. While
downloading the data, the Data Load dialog window appears,
indicating the data loading status by counts.
In meantime, the MP-11 Main Unit LCD screen displays as
shown on the right.
Once the data transferring process is completed, the data
loading status counter display will disappear automatically;
however, the MP-11 Main Unit LCD screen remains as shown
on the right, so press “Esc” button.
The data will be saved in the folder assigned in the General
Dialog Window, “Data Folder”.
After the data are downloaded to the PC, a message appears to
verify whether to delete the data from the Main Unit; select either
[Yes] or [No] button.