EKO INSTRUMENTS CO., LTD. I-V Curve Checker MP-11 Instruction Manual Ver.7
2. Graph Tab
Table 9-2. Graph Tab Functions
Date (Calendar Function),
__Days
Displays the measured dates.
By clicking the dropdown list button, calendar appears and allows to select
desired date from the calendar by click.
Also multiple days of data can be displayed on the list by setting the
number of days from the first measurement date.
Includes Low Irradiance Data
checkbox
Check here to list the measurement data with irradiance lower than the
threshold setup in the “Reference Solar Irradiance” setting.
List of data which are subjected to the measurement date(s) are listed in
this window.
Check the item(s) to be displayed on graph.
Each graph line can be modified with desired color.
Manual Graph Scale
Checkbox
Check here and enter the values for voltage and current to change the
scales for graph display.
Click to show the graph for the subjected data.
Enter the data number here, and click [Upload] to upload the data from PC
to MP-11 Main Unit, or [Erase] to erase the data from MP-11 Main Unit.
Narrows down the data search by PV module/array name.
Enter the PV module/array name and press Enter key.
Select all data listed in the data list.
Clear all data selected in the data list