5.5.1 Grid and dual generator application example with optional storage
G1
G2
GCB
GCB
MCCB
MCB
To load
elgris
SMART METER
MCB
~
=
elgris BASIC
elgris
SMART METER
GRID
Generator 1
200 kVA
Generator 2
50 kVA
power line
Ethernet
MCB
~
=
STORAGE
3~ meter
switch
In this example the elgris BASIC is used as the master controller. The BASIC communicates with each
generator over Ethernet and collects the load of each generator. The BASIC controller automatically
determines the optimum setpoint for each generator and sends a setpoint to the PV inverters.
When the grid is connected to the load, the grid setpoint is used.
In case that the PV energy available is higher than the possible load for the whole system, an optional
storage can be charged and discharged later.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the elgris HYBRID BASIC and is the answer not in the manual?

elgris HYBRID BASIC Specifications

General IconGeneral
Brandelgris
ModelHYBRID BASIC
CategoryController
LanguageEnglish