..
3.3. From From the tthe task liask list, ust, undender Wizr Wizards, ards, seleselectct
. Use this wizard to create. Use this wizard to create
LUNs and, optionallyLUNs and, optionally, assign the LUNs to , assign the LUNs to a host/server system.a host/server system.
For more information on these tasks, follow the instructions in the For more information on these tasks, follow the instructions in the Unisphere online help.Unisphere online help.
AttacAttach bezelsh bezels
When all of the components have been installed, all of the screws have been tightened, and all ofWhen all of the components have been installed, all of the screws have been tightened, and all of
the cables have been installed securely into the proper ports, return to the front of the cables have been installed securely into the proper ports, return to the front of the site rackthe site rack
and select the correct bezel for the and select the correct bezel for the component and press the bezel into place on the front of component and press the bezel into place on the front of thethe
component.component.
IMPORTANTIMPORTANT
The DPE left rail The DPE left rail has a connector which protrudes through the cabinet channel holes. The cable kithas a connector which protrudes through the cabinet channel holes. The cable kit
for the VNX5200 includes a cable to for the VNX5200 includes a cable to connect from the rear of that connect from the rear of that rail to the cabinet power. Seerail to the cabinet power. See
Fig
Figureure 2828..
Connecting the power to the DPE rail for the bezelConnecting the power to the DPE rail for the bezel
1.1. LocaLocate the bete the bezel fozel for eacr each instah installed clled compoomponentnent..
VNX-000370
VNX-000370