Do you have a question about the EMC VNX VNX5200 and is the answer not in the manual?
Model | VNX5200 |
---|---|
Category | Network Hardware |
Maximum Drives | 125 |
RAID Support | RAID 0, 1, 5, 6, 10 |
Form Factor | 2U |
Storage Processor | Dual |
Drive Types | SAS, SSD |
Connectivity | Fibre Channel, iSCSI, FCoE |
Redundancy | Yes |
Storage Type | Block and File |
Operating System | VNX Operating Environment |
Upgrade the VNX OE to resolve unexpected reboots after ~80 days of runtime.
Upgrade disk drives to prevent degradation and failure after six months of use.
A checklist to determine necessary preparations before system installation.
Steps to slide and secure the DPE into the installed 3U DPE rails.
Connect the storage processors and Windows host to the public LAN on the same subnet.
Connect SP power A to PDU A and SP power B to PDU B using color-coded cables.
Check DPE and SP LEDs to confirm correct power-up after 15 minutes.
Connect a workstation to the system on the same subnet for initialization.
Download and run the Unisphere Storage System Initialization Wizard.