C6.1.6/0613-0915/E 42
Number of active compressor when probe error
Minimum capacity for digital compressor
Maximum capacity for digital compressor
Time with DGS at PMA before starting another load
Time with DGS at PMi before switching off another load
Disable (0-NO) - Enable (1-YES)
Disable (0-NO) - Enable (1-YES)
Disable (0-NO) - Enable (1-YES)
Disable (0-NO) - Enable (1-YES)
Disable (0-NO) - Enable (1-YES)
Disable (0-NO) - Enable (1-YES)
Disable (0-NO) - Enable (1-YES)
Disable (0-NO) - Enable (1-YES)
Disable (0-NO) - Enable (1-YES)
Disable (0-NO) - Enable (1-YES)
Compressor regulation control signal
Pressure (0-PRS) - temperature (1-TMP)
Compressor On time with faulty probe
Compressor Off time with faulty probe
Minimum time between two starts (same compressor)
Delay between compressor switch-off and start-up (same compressor)
Delay between two different loads start-up
Delay between two different loads switch-off
Minimum time a stage stays switched On
Maximum time a stage stays switched On
[0.00÷24.00] hour res.10min
don delay enabled also for the first request
doF delay enable also for the first switching off