EasyManuals Logo

Emerson ECD-002 User Manual

Emerson ECD-002
7 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Operating instruction
EC3-P33 Superheat Controller and
ECD-002 Keypad / Display Unit
Installation in non explosive environment
Emerson Climate Technologies GmbH www.emersonclimate.eu
Am Borsigturm 31 I 13507 Berlin I Germany Date: 04.05.2017 EC3-P33_OI_ML_R01_865919.docx
General information:
EC3-P33 is the superheat controller for systems with flammable refrigerants
(A2L/A3) and able to drive EMERSON Valves EX4-7-…FLR via M12 Connector
ECV05A.
Note: This document contains short form instructions for experienced users.
Warning:
EC3-P33 has a potential ignition source and does not comply with ATEX
requirements. Installation only in non-explosive environment.
EX4-7…FLR are currently released for R290 in term of compatibility. The
other listed refrigerants are subject to qualification at later stage. No
warranty or product liability if EX4-7…FLR to be used with other
refrigerants stored in software of EC3-P33.
Safety instructions:
Read operating instructions thoroughly. Failure to comply can result in device
failure, system damage or personal injury.
According to EN 13313 it is intended for use by persons having the
appropriate knowledge and skill.
Ensure that the system is correctly labeled with applied refrigerant type and
a warning for explosion risk.
Do not exceed the specified maximum ratings for temperature (max.+60°C),
voltage and current.
Before installation or service disconnect all voltages from system and device.
Do not operate system before all cable connections are completed.
Entire electrical connections have to comply with local regulations.
Note: The EC3-P33 series contains a VRLA battery = valve regulated rechargeable
lead-acid battery. The battery must NOT be disposed of with other commercial waste.
Instead, it is the user’s responsibility to pass it to a designated collection point for the
safe recycling of batteries (harmonized directive 2012/19/EU). For further
information contact your local environmental recycling center.
Mounting position:
The EC3-P33 is designed to be mounted onto a standard DIN rail. Mounting position:
on vertical walls, with stepper motor connector on top side only.
Mounting of ECD-002:
ECD-002 can be installed at any time also during operation.
ECD-002 can be mounted in panels with
71x29 mm cutout.
Push controller into panel cut-out.(1)
Make sure that mounting lugs are flush with
outside of controller housing
Insert Allen key into front panel holes and turn
clockwise. Mounting lugs will turn and gradually
move towards panel (2)
Turn Allen key until mounting lug barely touches
panel. Then move other mounting lug to the same
position (3)
Tighten both sides very carefully until keypad is
secured. Do not over tighten as mounting lugs
will break easily.
Electrical Installation:
Refer to the electrical wiring diagram for electrical connections.
Do not apply voltage to the controller before completion of wiring.
Ground the metal housing with a 6.3 mm spade connector.
Keep controller and sensor wiring well separated from mains wiring.
Minimum recommended distance 30 mm!
Ensure that cables are not mounted near sharp edges.
Use a class II category transformer for 24 VAC power supply. Do not ground the
24 VAC lines. We recommend using individual transformers for EC3 controller(s)
and for 3
rd
party controllers to avoid possible interference or grounding problems
in the power supply.
Connecting any EC3 inputs to mains voltage will permanently damage the EC3.
The use of the relay is essential to protect the system in case of power failure if the
communications interface or the ECD-002 are not utilized.
If the output relay is not utilized, the user must ensure appropriate safety pre-
cautions are in place to protect the system against damage caused by a power
failure.
In order to provide system protection in the event of power loss, it is recommended
to change the battery annually.
Digital input status is dependent to operation of compressor/thermostat
Commander
Operating condition
Digital input (I)
Compressor
Compressor starts
Closed / 24 V (Start)
Compressor stops
Open / 0 V (Stop)
Thermostat
Demand (compressor must be ON)
Closed / 24 V (Start)
No demand
Open / 0 V (Stop)
Wiring:
v
2: White wire 4: Black wire 3: Blue wire 1: Brown wire
G: Remote control panel, system controller
H: Alarm relay, dry contact. Relay coil is not energized at alarm or power off.
I: Digital input (0V/open = Stop; 24 V/closed = Start)
J: Transformer Class II, 24 VAC secondary / 25 VA
K: Third party controller (can use the analog output signal from EC3)
Preparation for Start-up:
Vacuum the entire refrigeration system
Note: EX4-7-FLR are delivered at half open position. Do not charge system
before closure of valve.
Apply supply voltage 24 V to EC3 while the digital input is 0 V (open). The valve
will be driven to close position.
After closure of valve, start to charge the system with refrigerant.
Start the system and check the superheat and operating conditions.
!

Other manuals for Emerson ECD-002

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Emerson ECD-002 and is the answer not in the manual?

Emerson ECD-002 Specifications

General IconGeneral
BrandEmerson
ModelECD-002
CategoryController
LanguageEnglish

Related product manuals