EasyManua.ls Logo

Emerson Liebert GXT4-5000RT208 - Install the Power Distribution Box on 8000 VA and 10,000 VA Models; Distribution Box Electrical Connections; Table 2-1 Branch Circuit Breaker Ratings

Emerson Liebert GXT4-5000RT208
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
Liebert
®
GXT4
User Manual 24
2.6.4 Install the Power Distribution Box
on 8000VA and 10,000VA Models
1. With the cover or distribution box removed, press the UPS and distribution box connectors together.
Ensure that the connectors are fully seated.
2. Align the screw holes and press the power distribution box onto the UPS, making sure that the tabs at
the bottom of the box fit into the slots on the UPS.
3. Attach the box to the UPS by installing screws into the two holes at the top of the box.
4. Tighten the screws.
5. Turn the output and input breakers On.
6. Start the UPS according to startup instructions.
2.6.5 Distribution Box Electrical Connections
Electrical connections are made through a removable power distribution box that attaches to the rear of the
UPS.
PD2-HDWR-MBS, PD2-001, PD2-002, PD2-003, PD2-004, PD2-005, PD2-006 and PD2-007 models
fit the 5000 and 6000VA models of the Liebert GXT4
PD2-L630 fits the GXT4-6000RTL630
PD2-101, PD2-102, PD2-103, PD2-104, PD2-105, PD2-106, PD2-107, PD2-108, PD2-109, PD2-200,
PD2-201, PD2-202, PD2-204models fit the 8000 and 10,000VA models of the Liebert GXT4
The installer must provide an upstream branch circuit breaker. The input circuit breaker on the distribution
box and the output circuit breaker on the rear of the power distribution box disconnect all power between
the main cabinet and the distribution box.
Models equipped with a manual bypass breaker pass bypass power directly to the bypass breaker from the
input terminal block. The input circuit breaker on the distribution box does not disconnect power from the
manual bypass breaker.
!
WARNING
Risk of electric shock. Can cause injury or death.
The UPS must be shut down or the load must be transferred to an external maintenance bypass
before a power distribution box may be added, changed or removed.
If the UPS will be shut down, the connected load must be shut down (refer to 4.5 - Shut Down the
GXT4).
If the UPS will be transferred to maintenance bypass, it must be transferred to an external
maintenance bypass. A maintenance bypass in the UPS frame must not be used.
Verify that the Liebert GXT4 is shut down and that all local and remote electric input power has
been disconnected before beginning any work on or in the UPS.
Table 2-1 Branch circuit breaker ratings
Unit Rating Maximum Breaker Rating
5000VA
D Type 30A Long Delay
6000VA
8000VA
D Type 60A Long Delay
10,000VA

Table of Contents

Related product manuals