June 2016
14
Quick Start Guide
Step 8: Tighten cable glands
Apply PTFE tape or other sealant to the threads.
Step 9: Mount the cover
Make sure it is fully engaged to meet Explosion-proof requirements.
Step 10: Lock the cover with the locking screw
Required for ATEX, IECEx, NEPSI, INMETRO, and TIIS installations only.
Step 11: Connect the power supply