EasyManua.ls Logo

Engcon EC05B - Crane Boom; Maneuvering; DC2 Control System (for Machines with Double-Acting Hydraulic Circuit); Control System 10 (for Machines with Proportional Control Hydraulic Circuits)

Default Icon
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5 Operation
WARNING
When using pallet forks together with the tiltrotator,
exercise caution and maneuver carefully. The load can
easily fall off during rapid rotation or tilting.
5.7. Crane boom
The tiltrotator may not be used together with a crane boom. During crane boom operation,
the tiltrotator must be disconnected from the carrier.
5.8. Maneuvering
The functions described for each control system apply to the recommended installation/
configuration. Deviations may occur depending on the user's preferences for alternative
button functionality and configuration.
5.8.1. DC2 control system (for machines with double-acting
hydraulic circuit)
The engcon control system allows simultaneous operation of all functions.
Refer to separate user manual supplied on delivery. Also available on
the website or by contacting engcon.
5.8.2. Control system 10 (for machines with proportional control
hydraulic circuits)
The external control system allows simultaneous operation of all functions.
Refer to the instructions for mounted/installed, external control
systems; contact/support apply accordingly.
5.8.3. Control system 9-2 (for machines with two or more
proportionally controlled hydraulic circuits)
Allows simultaneous operation of two functions.
Refer to separate user manual supplied on delivery. Also available on
the website or by contacting engcon.
26

Table of Contents

Related product manuals