Page 52
SCHEDULE 01
SQUEEZE count
............00 cycles.
WELD/HEAT count
.........desired WELD count that occurs after forging takes place.
PERCENT CURRENT
.......desired PERCENT CURRENT for WELD during forge.
HOLD count
...............desired HOLD count.
OFF count
.................00 cycles.
IMPULSES
................01 (no impulses).
COOL count
................00 cycles.
VALVE MODE
.............06 (Valve #2 and Valve #3).
CYCLE MODE
.............00 (single spot mode).
SLOPE MODE
.............00 (no slope).
SLOPE COUNT
............00 cycles.
In the following example, solenoid valve 1 will be the standard valve and solenoid valve 2
will be the forging valve. The total weld time is 15 cycles at 95 percent current with the
forging valve activated after 10 cycles.
SCHEDULE 00
SCHEDULE 01
SQUEEZE count
........20 cycles.
SQUEEZE count
........ 00 cycles.
WELD/HEAT count
.....10 cycles.
WELD/HEAT count
..... 05 cycles.
PERCENT CURRENT
. . . 95 PERCENT.
PERCENT CURRENT
. . . 95 PERCENT.
HOLD count
...........00 cycles.
HOLD count
........... 20 cycles.
OFF count
.............00 cycles.
OFF count
............. 00 cycles.
IMPULSES
............01 (no impulses).
IMPULSES
............ 01 (no impulses).
COOL count
............00 cycles.
COOL count
........... 00 cycles.
VALVE MODE
.........01 (Valve #2).
VALVE MODE
........ 06 (Valve #2, #3).
CYCLE MODE
.........02 (chained).
CYCLE MODE
........ 00 (single spot).
SLOPE MODE
.........00 (no slope).
SLOPE MODE
......... 00 (no slope).
SLOPE
COUNT
...... 00 cycles.
SLOPE COUNT
...... 00 cycles.
NOTE:
For Forge during weld it is possible to select a percent current for the first schedule
and a different percent current for the second schedule.
Other combinations of weld schedules may be combined to create other FORGING
schedules. For example it would be possible to use UP SLOPE in the first sequence and
Pulsation in the second sequence.
:(/'&855(17'(/$<
WELD CURRENT DELAY provides a time delay and output to the machine solenoid valve
circuit. When the weld wheels are lowered, a delay before weld current is applied is required
to insure the wheels are together and sufficient pressure is attained. WELD CURRENT
DELAY is represented by squeeze time on the front panel. To add WELD CURRENT
DELAY to a SEAM sequence, add SQUEEZE time to the first schedule of the SEAM
sequence. If the sequence is programed for INTERMITTENT SEAM or ROLL SPOT the
programed SQUEEZE time will only be in effect upon initiation.
To return the control to SPOT mode, the EXTENDED FUNCTION [SE] Mode must be
selected. See section 7.3 EXTENDED FUNCTIONS. Use the SCHEDULE SELECT Push
Buttons (20 & 21) and SCHEDULE Display (22) to select [SE]. With the control in the
PROGRAM Mode enter a 00 into the DATA Display (4) using DATA Push Buttons (5 &
6). As typical of other data entry the ENTER Push Button (29) must be depressed to load the
desired data.

Other manuals for Entron EN1000 series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Entron EN1000 series and is the answer not in the manual?

Entron EN1000 series Specifications

General IconGeneral
BrandEntron
ModelEN1000 series
CategoryController
LanguageEnglish

Related product manuals