EasyManua.ls Logo

Epson 610 - Page 34

Epson 610
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EPSON Perfection 610 Revision B
Assembly and Disassembly Disassembly Procedures 34
7. Release the timing belt from the driven pulley.
8. Remove the driven pulley assembly by pushing it in the direction
indicated with the arrow. (See Figure 4-17.)
9. Remove the CR shaft from the Carriage Unit.
7.
Figure 4-16. Timing Belt Removal
Figure 4-17. Driven Pulley Assembly Removal (3)
Figure 4-18. Carriage Guide Shaft Removal
Driven Pulley
Timing Belt
CR Shaft
Carriage Unit

Related product manuals