EasyManua.ls Logo

Erato GP20+ - Page 39

Erato GP20+
46 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Instruction manual for installation and operation of automatic pellet burner “ERATO GP20+”
(Version : 02.02.2010 10:36) p. 39/50
No power supply Check the status of “POWER”
indicator, positioned on the
interface panel of the burner.
Check the connection and
electricity parameters of the
burner’s main unit and the heat
consumer power supply – the
parameters should be as follows
220 V, 50 Hz – it should be
p
erformed by authorized
technician only;
Check the correctness of the
power supply connection,
according to the applied electrical
scheme – it should be performed
by authorized technician only;
Check for tightness of electrical
joints of the control board – it
s
hould be performed by
authorized technician only;
7.
The burner is
not running or it
stops
Absence of
“START” signal to
the burner’s main
unit
Check the status of “START”
indicator – it should be lit. Check
the wiring and connection of the
burner’s main unit and the power
supply box of the heat
consumer’s power supply - – it
s
hould be performed by
authorized technician only;
Check for tightness of electrical
joints of the control board – it
s
hould be performed by
authorized technician only;
Check the operation and
functioning of the control
module, which gives operating
signal to the burner – check the
parameters of the power supply –
it should be as follows : 220 V,
50 Hz – it should be performed by
authorized technician only;

Table of Contents