EasyManua.ls Logo

Ericsson BDV BS 101 01 - Page 14

Ericsson BDV BS 101 01
225 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15(46)
Date Rev
DocumentnumberPrepared
Doc respons/Approved Checked Reference
1998-05-29
L
1531-BDV BS 101 01 Uen
INSTALLATION INSTRUCTION
Subject responsible
6.7 BTU-B (ROF 157 5121/_)
Applies for indices 1 and 3
The BTU-B provides connection for up to 8 physical
links and every physical link can be configured as a S-
or T-interface. On the S-interface every link provides
remote power feeding with 40V/50 mA = 2W and con-
nection for up to 8 terminals.
6.8 BTU-B2 (ROF 157 5121/_)
Applies for indices 4 and 5
DIP-switches position 410-417
These switches control S- and T-interface termination
and S-interface power feeding on the link 0...7.
ON
410 411
ON
414 415
412 413
416 417
418
ON
ON
ON
ON
ON
ON
ON
A
B
C
D
Insert PROM "RYS 102 521/ 1
A
B
Insert PROM "RYS 102 521/ 2
Insert PROM "RYS 102 521/ 3
C
D
Insert PROM "RYS 102 521/4
418
410 411
414 415
412 413
416 417
A
B
Insert PROM "RYS 102 521/ 3
A
B
Insert PROM "RYS 102 521/ 4
On factory delivery all
switches are set to OFF
Connects 100 send side termination
Connects power feeding ground
Connects -40V for power feeding
Connects 100 receive side termination
ON
3
21
4

Table of Contents