Installation Operations Manual

Questions and Answers

  • J
    Jill KingJul 29, 2025
    Why is there excessive Skirting Rubber wear on my ESS Industrial Equipment?
    • J
      John WoodwardJul 29, 2025
      Excessive Skirting Rubber wear may be due to the Skirting Rubber being installed too tightly against the conveyor belt. To resolve this, check the tension of the Skirting Rubber and adjust it if necessary.
  • M
    Mark SteeleAug 7, 2025
    What to do if product is leaking from under the skirting of ESS 2000 Industrial Equipment?
    • G
      George SanchezAug 8, 2025
      If product is leaking from under the skirting of your ESS Industrial Equipment, it may be because the Skirting Rubber is not installed uniformly against the belt. Make sure that the Skirting Rubber is installed evenly along the conveyor belt.
  • K
    Kathleen FloydAug 17, 2025
    Why won’t the conveyor belt run after installation in my ESS Industrial Equipment?
    • S
      Steven WhiteAug 17, 2025
      If the conveyor belt won’t run after installation on your ESS Industrial Equipment, the Skirting Rubber may be installed too tightly against the conveyor belt. Check the tension of the Skirting Rubber and adjust it if needed.

Summary

Warranty Note

Section 1: Safety

Section 2: Introduction

Section 3: Preparation for Installation

3.1 Check Installation Drawings

Verify correct drawings and equipment are available for conveyor installation.

3.2 Assemble Necessary Tools & Safety Equipment

Gather all required tools and safety equipment before commencing installation.

3.3 Observe Conveyor While Running

Assess conveyor operation, belt tracking, idlers, and material loading for proper setup.

3.4 Inspect Wear Liners and Chute Wall

Examine wear liners and chute walls for condition and alignment to ensure proper skirting fit.

3.5 Unusual Conditions

Identify and contact ESS for installation if unusual conditions like curves, high speeds, or extreme temperatures exist.

Section 4: Installation

4.1 Installation Procedure

Step-by-step guide for installing the ESS 2000 Back Plate and Clamp Plates onto the conveyor.

4.2 Cutting Procedure for Rubber Skirt Seals

Detailed steps for safely measuring, marking, and cutting the ESS 2000 rubber skirt seals.

Section 5: Commissioning