EasyManua.ls Logo

Et DRIVE 1000 - Installing the Baseplate

Et DRIVE 1000
53 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
Baseplate and fastener kit assembly.
2
1
1
3
2
3
2
3
2
3
3
4
5
3
4
5
6
7
Diagram
number
Descripon
1
Custom cup bolts for fastening
the gearbox to the baseplate.
2 M10 Nylock nuts.
3 M10 Flat washers.
4 M10 Machine nuts.
5
M10 J-Bolts for concrete casng
method.
6 Cabling conduit piping.
7 Baseplate.
Installing the baseplate.
There are a number of dierent fastening techniques that can be used to fasten the baseplate in posion. The standard kit is supplied with J-bolts
so that the baseplate can be cast in concrete. While this method oers a nice solid base it takes more than 48hrs to install as the concrete must cure
properly before connuing with the installaon. Whichever mounng method you opt for, the posion of the base plate will always remain the same.
Here are the dimensions to use when posioning the base plate. The baseplate should be installed above the highest point of ooding that may occur
with the run o of water down the driveway.
Proudest component of
the gate on the motor side
Edge of the baseplate
nearest to the gate
Required space
30 - 50mm
Gate positioned where the proudest component
is opposite the base plate of the operator.
Base plate positioned on the opposite
side of the gate guide/emergency post,
to the driveway.
Gate guide/
emergency post
PLAN VIEW OF THE BASEPLATE INSTALLED
Driveway
Required space
> 50mm to allow for
the optional security
bracket.
Cable inlet.

Table of Contents