DLAS SERIES FURNACES
Installation Procedure for DLAS Furnace
The following steps are listed for installation of furnace and
need not be performed in the exact order as listed:
Refer to Figure 6 to secure sub-base to floor and duct
connector to sub-base.
Check to make sure roof jack is not extending too far
down into furnace location. Slide furnace into sub-
base.
Opening and knock-outs are provided in furnace base
toinstallafrontfuelline.
A. Furnace requires sub-base (Included with furnace)
For convenience and faster installation, a template is
provided on the furnace shipping carton. This may be
cut out and used to accurately locate furnace, floor and
vent openings. The template is shown in Figure 5, the
duct connector in Figure 10.
Refer to Figures 2, 3 and 5 to locate template on the
floor to provide proper clearances to the walls and the
front.
Locate template so that furnace opening outline is cen-
tered over underfloor supply duct as accurately as pos-
sible. This is important because of the limited adjust-
ment from side to side, and from front to rear of the duct
connector.
SECURE SUB-
BASE TO FLOOR
FIRMLY WITH NO
LESS THAN 2
SCREWS OR
NAILS
SECURE DUCT
CONNECTOR
TO SUB-BASE
WITH 4
SCREWS.
USE SCREW HOLES IN SUB-
BASE APPLICABLE TO POSI-
TION OF DUCT CONNECTOR
TO FASTEN DUCT CONNEC-
TOR.
Figure 10
floor
OPENING
BEND TABS
OF DUCT
CONNECTOR
UNDER DUCT
OPENING TO
SECURE TO
THE SUPPLY
DUCT.
SECURE SUB-BASE TO
FLOOR WITH 2 NAILS OR
SCREWS.
TABS TABS
DUCT DUCT
1. INSERT DUCT PLENUM CON-
NECTOR INTO DUCT CUT-OUT.
2. BEND BOTTOM TABS OVER AND ONTO
THE UNDERNEATH DUCT SERVICE.
FOR IMPROVED
AIR SEAL, DUCT
CONNECTOR
FLANGES MAY BE
SEALED TO THE
SUB-BASE WITH
ALUMINUM DUCT
TAPE.
Follow this procedure to avoid serious misalignment of fur-
nace duct connector opening and supply duct:
First, locate template on floor and cut 2” diameter hole
or small square hole as indicated on template.
Locate underfloor duct through hole and center “floor
cut-out opening” on template over duct.
Accurately cut “floor cut-out opening” from template,
mark floor opening, remove template and cut floor on
outsideedgeofmarkedlinetoallowforeasyinstalla-
tion of sub-base and duct connector.
B. Install Furnace
Remove panel from air conditioning compartment.
Check to make sure roof jack is not extending too far
down into furnace location. Slide furnace into location
and align over floor opening.
Openings and knock-outs are provided in furnace
base to install a front fuel line and/or front refrigerant
lines. For A/C, remove the knock-out, and if rear lines
are to be used they must be installed before the duct
connector is installed and secured in place. See Figure
10.
C. Securing Furnace
Make any minor adjustments in the furnace location
necessary to insure that the opening in the furnace bot-
tom is centered over the opening in the duct. Secure
furnace to floor, as required, through holes at front and
rear of furnace. Holes for screws are located in bottom
flange front corners and rear flanges.
Secure furnace to wall at top by using metal strap pro-
vided. See Figure 13.
Mobile Home manufacturers may add straps equiva-
lent to provided straps, if required for securing furnace
to structural member.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Evcon DLAS Series and is the answer not in the manual?

Evcon DLAS Series Specifications

General IconGeneral
BrandEvcon
ModelDLAS Series
CategoryFurnace
LanguageEnglish

Related product manuals