- position the grille holding guide fails in the holes of the racks (Fig. 6)
Fig.6
- insert the grilles for food in the special guides
- insert the condensate water drain pan into the special guide rails already xed under the blast
chiller if provided.
14.2 REM Blast chillers (Fig. 7)
Fig.7
- position the blast chiller as described above (Fig. 5)
- N.B.: the system is pressurized by the manufacturer with azoto
- prepare the two pipes that protrude from the temperature blast chiller for the connection to the
respective pipes
- connect the pipes of the condensing unit to the pipes of the blast chiller
- create a vacuum and then carry out the loading of the refrigerant
- make the electrical connection of the blast chiller to the condensing unit