EXT
RA - FLUGZEUGBAU GmbH
SERVICE MANUAL EXTRA 200
CHAPTER 05
PAGE 27
PAGE DATE: 1. July 1996
O 7 Check painting visually for general condition (blisters etc.).
O 8 Check laminate for erosion, scratches and stone nicks.
Horizontal Stabilizer
Leading edge
O 1 Check surface for erosion, scratches, stone nicks and impact damage.
O 2 Check bonding top/bottom for dents, cracks and delamination.
Front spar section
O 3 Check bonding skin/spar for delamination by coin tapping.
Rear spar section
O 4 Check bonding skin/spar for delamination by coin tapping.
Spar carry-through
O 5 Remove spar cap paint by a solvent. Perform visual inspection for
dents and cracks. Check for delamination by coin tapping. Restore
finish in accordance with Chapter 51-70-05.
O 6 Remove Spar web paint by a solvent. Perform visual inspection for
dents and cracks. Check for delaminations by coin tapping. Restore
finish in accordance with Chapter 51-70-05.
O 7 Replace attachment bolts and stop nuts. Check for proper torque in
accordance with Chapter 20-10-02.
O 8 Check steel sleeves for secure bonding to the spar.
Root and Tip
O 9 Check root rib for cracks, delamination and secure bonding to skin
and spars by coin tapping.
O 10 Inspect tip rib visually for general condition.
Elevator
O 1 Check tip rib bonding to the skin laminate by coin tapping.
O 2 Check bonding skin/spar for delaminations by coin tapping.
O 3 Check bonding trailing edge for cracks and delamination by coin
tapping.
O 4 Detailed visual inspection of mounting brackets for damage, cracks
and proper attachment. Replace bolts and stop nuts. Check for proper
torque in accordance with Chapter 20-10-02.
Inspector:
Mechanic:
Inspections
Date:
Serial No.:
1000 hours
SCHEDULED MAINTENANCE CHECKS
Significant Items Inspection
PAGE DATE: 15. December 1999