Chapter 4: Preinstallation checklist
Before you install the ERS 3500 Series, make sure that you complete the tasks in the preinstallation
checklist.
No. Task Description
1. Review the technical specification for
the switch. Make sure that the area
where you install the switch and
where it will operate meet the
requirements.
For the physical, electrical, and
environmental specifications, see
Technical specifications on page 18.
2. Verify the AC power specifications.
Optionally order a redundant Power
Supply Unit (PSU) to provide
redundancy and load sharing.
See AC power specifications on
page 42.
3. Make sure that you have the
following tools and cables:
• Phillips #2 screwdriver RJ-45
console port cable
• ESD cable
See Cable requirements on page 22.
4. Unpack the equipment. Observe ESD precautions when you
unpack the equipment. See Electrostatic
discharge on page 17.
5. Verify the contents of the shipped
package.
See Package contents on page 21 for
a description of the components that are
provided with the switch.
6. Make sure that the power cord has
the correct country-specific
termination.
See AC power cord specifications on
page 42.
7. Depending on the switch model,
prepare the shelf or table or prepare
the equipment rack.
If the switch model is ERS 3510GT or
ERS 3510 GT PWR+, prepare shelf or
table and ensure the surface supports
the combined weight of the switch and
attached cables from 15 and 20 pounds
(7 to 9 kilograms).
Table continues…