EasyManua.ls Logo

FAAC A140 AIR Series - Start-Up of the Automated System

FAAC A140 AIR Series
70 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
26
230/115
ENGLISH
14A START-UP OF THE AUTOMATED SYSTEM
Manually check correct sliding of the leaves and of all the moving elements.
Carry out/check the electrical connections on the control board of the cables coming from the power supply unit, from the
motor, and from all accessories, consulting the instructions of the control board.
Use the raceways - suitably positioned (Fig. 44 ref. and ) - to route the cables inside the support profile, thus preventing them
from coming into contact with moving parts.
Set motor rotation direction according to type of door (refer to the control board instructions).
Connect the 115V~/230V~ power plug in the specific connector of the power supply unit (Fig. 44 ref. ).
To remove the electronic board cover, unscrew the two screws and press the two clips (Fig. 44 ref. )
Check if the switch in fig. 44 ref. is correctly positioned (230V~/115V~).
Check the efficiency of all installed accessories, especially photocells and sensors.
Fuse
5x20 T2,5A/250V~
fig. 44
A spare fuse is supplied
A spare fuse is supplied
.
.
Attention: do not remove
the highlighted screw

Related product manuals