Manual e-MatriX 800
--------------------------------------------------------------------------------------------------------------------------------------
10 < < < <
4.4 Build-in structure
The e-MatriX needs a minimum ventilation of 50cm² above and 210cm² underneath the fire.
The construction may not rest on the fire.
The e-MatriX needs a minimum free space of 50mm above the fire.
5 Removing glass
5.1 Front glass (e-MatriX front glass only)
Remove the cover strip see fig. 2.0a.
Rotate the glass clamp clockwise see fig. 2.0b.
Place suction cups and remove the front glass see fig. 2.0c.
5.2 Front glass (e-MatriX 2 or 3 sided glass)
Rotate the glass clamp clockwise see fig. 2.1a and 2.1b.
Place suction cups and remove the front glass see fig. 2.1c.
For replacing the front glass repeat the steps in reverse order.
5.3 Side glass
For cleaning only it’s not necessary to remove the side glass.
First remove the front glass see Chapter 5.1 or 5.2.
Place a suction cup and remove the side glass see fig. 2.2.
For replacing the glasses repeat the steps in reverse order.
6 Removing fuel bed
!! Never lift up the fuel bed without using the supplied handles.
!! Keep these handles for future use.
Remove the front glass see Chapter 5.1 or 5.2.
Cover the frame to avoid scratches see fig. 3.1-A.
Screw the handles in the fuel bed see fig. 3.0.
Lift up the fuel bed carefully, disconnect the plug and store it at a safe place see fig. 3.1.
For replacing the fuel bed repeat the steps in reverse order!
7 Placing decoration material
!! Keep decoration material away from children, persons with reduced physical or mental
capabilities and animals.
!! Don’t place decoration material in the center area see fig. 6.0.
The supplied artificial ash and chips can be used to personalize your fire!