EasyManua.ls Logo

Fairland IPH100T - Page 21

Default Icon
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
FOR INSTALLERS AND PROFESSIONALS
Parallel connection with filtration clock
A: Water pump timer
B: Water pump wiring of Heat Pump
Note: The installer should connect A parallel with B (as above picture). To start the
water pump, condition A or B is connected. To stop the water pump, both A and
B should be disconnected.

Other manuals for Fairland IPH100T

Related product manuals