EasyManua.ls Logo

Fiore FI310 - Installation Preparation; Models Available; Parts Included; Materials You May Need

Default Icon
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
7
INSTALATION PREPARATION
MODELS AVAILABLE
FI310 Series 11.8Natural Gas/11.8”
LP
FI320 Series 11.8Natural Gas/11.8”
LP
FI640 Series 22.8Natural Gas/22.8”
LP
FI850 Series 22.8Natural Gas/22.8”
LP
FI950 Series 30.3Natural Gas/30.3”
LP
These models are factory set for either natural gas or LP gas operation. Be sure to order the
correct
model for
the installation
situation.
PARTS INCLUDED
2 Screws Regulator 2 Hold Down
Brackets
MATERIALS YOU MAY NEED
Joint Sealant Pipe Fittings Shut-Off Valve CSA-Approved Flexible Gas
Line
1/2Min. ID, 1/2NPT Connection, 3-foot Maximum Length (Massachusetts
Only)
NOTE: Purchase new line, do not use previously used exible gas line.
TOOLS YOU WILL NEED FOR INSTALLATION
Pencil Phillips-Head Screwdriver Ruler or Straightedge Safety
Glasses
Saber Saw Pipe Wrench 1/8″ Drill Bit & Electric or Hand
Drill