EasyManua.ls Logo

Fiore FI310 - Page 8

Default Icon
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
9
PRE-INSTALATION CHECKLIST
1. When preparing cooktop opening, make sure the inside of the cabinet and the cooktop do not interfere with
each
other. (See section on preparing the
opening.)
2. Slide the cooktop out of the end of the box. Remove packaging materials, grate boxes, regulator and
literature
package from the cooktop before beginning
installation.
Use the shipping carton as a pad to protect customer countertops or ooring
3. Remove Installation Instructions from literature package and read them carefully before you begin. Be sure
to
place all literature, Owner’s Manual, Installations, etc. in a safe place for future
reference.
4. Make sure you have all the tools and materials you need before starting the installation of the
cooktop.
5. Your home must provide adequate electrical service tools to ensure your safety and to maintain your cooktop
as
well. (Refer to section on electrical
requirements.)
6. When installing cooktop in your home, make sure all local codes and ordinances are followed exactly as
stated.
7. Make sure the wall coverings, countertop and cabinets around the cooktop can withstand heat (up to
200°F)
generated by the
cooktop.