25
STEP 7
FINISH TIGHTENING LIFT CLEVIS. THE SIDE OF THE CLEVIS SHOWN BELOW IN FIGURE 7.1 MUST BE PARALLEL TO THE FRONT CRADLE BEAM. IF
NOT, REMOVE CLEVIS AND ROTATE BOLT IN SLOT UNTIL CLEVIS IS PARALLEL WHEN TIGHT. MAKE SURE THERE ARE NO TWISTS IN THE LIFTING
CABLE AND ATTACH THE 4” SHEAVE AND CABLE LOOP TO THE CABLE CLEVIS USING A ¾” x 3” BOLT AND ¾” JAM NUT. THE BOLT HEAD WILL
BE PARALLEL TO THE CRADLE BEAM (FIGURE 7.1).
TORQUE TO 100 FT-LBS (FIGURE 7.2)
APPLY A GENEROUS AMOUNT OF ANTI-SEIZE FROM INCLUDED PACKET TO THE INSIDE OF THE OF THE RIGID COUPLER AND TO THE
MOTOR SHAFT BEFORE ATTACHING THE DRIVE UNIT TO THE LIFT FRAME (FIGURE 7.3 & 7.4).