EasyManua.ls Logo

Flowmeter LDG - Unpacking and Inspection; Transportation and Handling

Flowmeter LDG
15 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Copyright Reserved, DONGYANG Corporation 3
Unpacking and Inspection
Upon receipt, examine your meter for visible damage. The meter is a precision measuring
instrument and should be handled carefully. Remove the protective plugs and caps for a
thorough inspection. If any items are damaged or missing, contact DONGYANG.
Make sure the flow meter model meets your specific needs. For your future reference, it might
be useful to record this information on nameplate in the manual in case it becomes unreadable
on the meter.
Transportation and Handling
Do not lift the detector from the Converter
housing, the junction box or the connecting
cable. Use lifting lugs for larger sizes is
recommended. Very large meter sizes are
packed and crated with the meter laying on
its side for shipping safety and stability
reasons. In order to lift the meter in vertical
position, it's recommended to use a sling
rigged method as shown below.
If using a forklift, do not lift the detector
from its body between the flanges. The
housing could be accidentally dented and
permanent damage could be caused to the
internal coil assemblies.
Warning: NEVER introduce the
forklift, chains, wire slings or any other
sharp object inside the flow tube for lifting
or handling purpose. This could permanently
damage the isolating liner and could render
the meter inoperable.