Framery Four
Main dimensions
Figure 2: Main dimensions
Required operating space
Note: If installing the optional seismic anchors, the required operating space will
differ. See section "Seismic anchoring requirements" for more information.
Figure 3: Required operating space
Installation instructions
info@frameryacoustics.com
7