Framery Four
1 Chassis
Attention: Make sure that the bolts are tightened to correct torque (20 Nm / 14.75
ft-lbs).
1.1 Front frame
1.2 Back frame
1.3 Bottom corner (2 pcs)
1.5 Vertical frame (4 pcs)
1.6 Horizontal frame (2 pcs)
1.1 Assemble the front frame
Note: Make sure that the bolts are properly tightened.
Installation instructions
info@frameryacoustics.com
9