INSTALL ATION
General starting points for installation
Perform the following steps before starting installation.
Stop valves must already be installed. See Option at page 9/10, if stop valves have not been installed.
Close the stop valves.
In existing installations, remove the tap, hoses and boiler if still in place.
Mark the existing cold and hot water connection.
Do not connect the M-Box to a hot water pipe.
There must be two wall plug sockets available for connection.
Installation video
https://youtu.be/4KPGVG_MoZg
Installation steps
Installing 3-in-1 tap (see page 2)
Installing M-BOX (see page 4)
Installing 5 or 10 litre boiler (see page 6)
Connecting 3-in-1 tap (see page 9)
Connecting 3-in-1 tap with hot water out of existing pipe (see page 11)
Connecting the drain line (see page 12)
Commissioning (see page 14)