EasyManua.ls Logo

FRANKLINWH AGate - Page 39

Default Icon
81 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step 5: Electrical Conduits
Install pull box after aPower cable hole
1. Select appropriate pull box according to the cable
distribution direction. Max. size: 4.8inx2.75inx2.2in
(L*W*H)
2. Use a #3X4” Phillips head cross screwdriver to take the
junction box apart.
3. Use a wrench to install the pull box behind the user
port compartment.
Diameter: 35mm
Diameter: 22.5mm
4. Use a diagonal cutting plier to remove the
knockout holes on the side gratings.
5. Install the three side trim gratings.
38

Related product manuals