070.650-IOM (AUG 2015)
Page 35
SGC ROTARY SCREW COMPRESSOR
INSTALLATION - OPERATION - MAINTENANCE
Start-up, 30
storage, 15
suction accumulator, 24
suction gas, 5
suction line, 3
suction pressure, 26
suction strainer, 23, 24
suction strainers, 5
superheating, 5
system piping, 26
T
thermal stability, 6
transmitter unit, 28
traps, 3
troubleshooting, 24
TROUBLESHOOTING, 27
hydraulic control valve, 27
Piston Seals, 27
SLIDE STOP, 27
Slide stop indicator rod, 27
SLIDE VALVE, 27
Solenoid coils, 27
Solenoid spool, 27
Unloader piston, 27
U
under-compression, 6
unloading, 6
V
vacuum, 4
Vacuum, 20
vacuum pump, 20
valve ports, 21
VAPOR PUMP, 3
Vi, 22
vibration analysis, 23, 26
vibration level, 24
VOLUME RATIO, 22
VOLUMIZER volume ratio control, 5
W
Warranty, 4
water vapor, 24
Water vapor, 24