EasyManua.ls Logo

Friedrich CP10 - Installation Instructions; Tools and Preparation Notes; Important Installation Cautions

Friedrich CP10
19 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation Instructions
Read these instructions completely and carefully.
Tools YouWill Need
[] Phillips-head screwdriver
[] Flat-blade screwdriver
[] Ruler or tape measure
Before YouBegin
[] Scissors or knife
[] Pencil
[] Level
[] Hammer
NOTE TOINSTALLER: Leave these
instructionswith the air conditioner after
installationis completed.
NOTE TO CONSUMER: Keep this Installation
and Operation Manual for future use.
Important notes:
It is recommended that proper attire be worn
during installation.
For personalsafety, this air conditioner must
be properly grounded.
It isimportant to have the wall outlet and circuit
checked by a qualified electrician if there is any
doubt as to whether a proper ground exists.
CAUTION:
Donot under any circumstances,cut or remove
the third (ground) prong from the power cord.
Donot change the plug on the power cord of
thisair conditioner.
Aluminum house wiring may present special
problems-consult a qualified electrician.

Other manuals for Friedrich CP10

Related product manuals