02/2017 3/17
1.1 Location of the Fronius Smart Meter
With the Fronius Smart Meter there are two possible energy paths/ locations where it can be installed.
In almost all cases, the Fronius Smart Meter will be installed in the feed-in path. This is also the default setting
in the Datamanager’s METER section.
/ Feed-in point
In this position the Solar Supply Main Switch is on the load side of the Fronius Smart Meter
/ Consumption path
In this position the Solar Supply Main Switch is on the grid side of the Fronius Smart Meter
Fronius
Utility
meter
Fronius Smart Meter
Loads
Loads
Fronius
Utility
meter
Fronius Smart Meter
Loads
Loads

Other manuals for Fronius 63A-1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fronius 63A-1 and is the answer not in the manual?

Fronius 63A-1 Specifications

General IconGeneral
BrandFronius
Model63A-1
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals