Do you have a question about the Fujitsu Siemens Computers CELSIUS R630 and is the answer not in the manual?
Graphics | NVIDIA Quadro |
---|---|
Expansion Slots | PCI Express |
Optical Drive | DVD-ROM |
Network | Gigabit Ethernet |
Ports | USB 2.0 |
Provides essential safety information for working with the workstation, including handling and environmental considerations.
Instructions for unpacking the workstation and checking the delivered components against the delivery note.
Overview of the few essential steps required to put the workstation into operation for the first time.
Connecting the workstation to mains voltage and the initial startup process for software installation.
Guide to installing the system software, following on-screen prompts and consulting manuals.
Procedures for switching the workstation on, off, and placing it in a ready-to-operate state.
Configuration options in BIOS Setup and methods for protecting data and physical security.
Advice on backing up data before software installation and troubleshooting power-on indicator problems.
Troubleshooting steps for a blank screen, including monitor power, brightness, and connection checks.
Resolving issues with missing mouse pointers and problems reading or writing floppy disks.
Instructions for installing or removing the hard disk drive, including casing and rail preparation.
Guidance on upgrading main memory, referring to the technical manual for the mainboard.
Guidance on replacing the processor, referring to the technical manual for the mainboard.
Procedure for installing a second processor, involving ventilation duct modification and technical manual consultation.
Steps for removing a second processor, including ventilation duct manipulation and technical manual reference.
Instructions for safely replacing the CMOS lithium battery, emphasizing correct polarity and disposal.