EasyManua.ls Logo

Fujitsu ASYA24LCC - Page 67

Fujitsu ASYA24LCC
116 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
08-08
Heating
*Defrosting operation is performed when temperature is less than 7 degrees C.
Frost appears on an outdoor unit heat exchanger at 7 or less degrees C.
*Solid line:Integral capacity/Input containing the defrosting cycle.
*Dotted line:Capacity/Input which does not contain the defrosting cycle.
*The Capacity and the input change as the current limit value varies with the outdoor temperature.
<Capacity>
<Input>
40%
50%
60%
70%
80%
90%
100%
110%
120%
130%
140%
-15 -10 -5 0 5 10 15 20
Outdoor DB ( C)
Capacity (%)
7 12 17 24
Indoor DB : 20 C
Maximum
operation
Maximum
operation
Maximum operation
(Without Frost)
Maximum operation
(With Frost)
Rated
operation
60%
70%
80%
90%
100%
110%
120%
130%
140%
150%
160%
170%
180%
-15 -10 -5 0 5 10 15 20
Outdoor DB ( C)
Input (%)
7 12 17 24
Maximum
operation
Maximum
operation
Maximum operation
(Without Frost)
Maximum operation
(With Frost)
Rated
operation
ASYA30LCC Capacity/Input data
o
Indoor DB : 20 C
o
o
o
1/2

Table of Contents

Other manuals for Fujitsu ASYA24LCC

Related product manuals