REPLACEMENT PARTS
PROCESS Installation of wire to Inverter assy
2
Comp Lead
1
Comp Lead
1
valve Coil Lead
Lead wire shall be beneath the rib.
Lead wire shall be beneath the rib.
6
Motor Lead
7
Motor Lead
7
Motor Lead
7
Motor Lead
7
Motor Lead
7
EEV Coil Lead
5
Thermistor (Outdoor Temp.)
4
Thermistor (Heat exchanger)
3
09-28
Thermistor (Discharge)
Each Lead Location
Spec. of slack
motor Lead.
Compressor lead shall be
located beneath motor lead
Model : AOYR24LCC