Power On Procedure (1)
The ETERNUS DX S2 systems can be Powered On directly
from the Controller Enclosure
Push the Power Switch
The "Power" LED of the CE switches on
The power on sequence takes about 2 minutes
If everything is OK, the green Ready LED in
the CE and the green Power LED in the DE
switch on