EasyManua.ls Logo

Fujitsu PRIMERGY CX2550 M4 - Page 60

Fujitsu PRIMERGY CX2550 M4
70 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
60 Operating Manual CX2550/60/70 M4
Starting up and operation
Switching the server node on
Ê Connect a USB storage medium (HDD, ODD or flash media) containing a
bootable image to your server.
Ê Press the On/Off button.
The power-on indicator lights up green when the server node is connected to
the mains.
I Alternatively, the power can be switched on/off on the chassis front panel
of the PRIMERGY CX400 M4 server enclosure.
Further information you can find in the "FUJITSU Server PRIMERGY
CX400 M4 Server Enclosure Operating Manual" and in the "FUJITSU
Server PRIMERGY CX400 M4 Server Enclosure Upgrade and
Maintenance Manual".
Starting up for the first time:
For Japan, please refer to " はじめにお読みください ".
Ê Insert ServerView Suite DVD in the DVD drive.
Ê Follow the on-screen instructions (see also section "Configuring the
server node" on page 62).
System already installed:
The server node is switched on, performs a system test and boots the
operating system.
I In the case of configurations with a large memory size, the boot
process may be prolonged and the screen may remain dark for about
20 seconds.
Switching the server node off
Ê Shut down the operating system properly.
I The server nodes are controlled via related operating panel areas on the
front side of the CX400 M4 server enclosure. See "FUJITSU Server
PRIMERGY CX400 M4 Server Enclosure Operating Manual".
I If the operating system does not switch the server node off automatically,
press the On/Off button for at least four seconds and/or send a
corresponding control signal for power button override.

Other manuals for Fujitsu PRIMERGY CX2550 M4

Related product manuals