EasyManua.ls Logo

Furuno SC-50 - Display Unit, Processor Unit

Furuno SC-50
101 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1. INSTALLATION
1-3
Radar Antenna
SC-series
Antenna
Bridge
Reception blocked by mast.
Location influenced
by reflected wave.
Example of antenna installed below superstructures
1.1.2 Display unit, processor unit
Choose a location where vibration and shock are minimal.
Install the units well away from locations subject to rain and water splash.
Locate the units away from air conditioner vents.
Keep the units out of direct sunlight because of heat that can build up inside
their cabinets.
Choose a well-ventilated location.
For the display unit, choose a location where it can be easily operated.
Leave sufficient space around the units to permit access for maintenance. See
the outline drawing for recommended maintenance space.

Table of Contents

Other manuals for Furuno SC-50

Related product manuals