Do you have a question about the G-U RZ 25 and is the answer not in the manual?
Explanation of danger, warning, and caution symbols used in the manual.
Mandatory regulations and directives for installation, including accident prevention.
Requirements for installation by trained personnel and relevant German directives.
Advice on electrical installation compliance with directives and coordination with experts.
Importance of instructions, user training, and handling the product.
Explanation of Smoke and Heat Exhaust Ventilation Systems (RWA).
Conditions for intended use, components, and manufacturer liability.
Overview of RWA compact control units for ventilation and smoke extraction.
Key functions including smoke/heat ventilation, time/weather control, and networking.
Detailed technical specifications like voltage, current, dimensions, and protection type.
List of included scope of delivery and optional accessories for the control units.
Safety instructions for mounting and installation, emphasizing electrical hazards.
Diagram and component identification for the RWA compact control unit.
Calculations for current values, drive consumption, and output ratings.
Detailed wiring diagram for connecting components to the RWA control unit.
Methods for calculating cable cross-sections and maximum lengths for drives.
Instructions for mounting the control unit and using IP mounting kits.
Critical safety precautions for electrical installation and power supply.
Steps for establishing the power supply connection to the control unit.
Instructions for correctly connecting the batteries to avoid damage.
Wiring diagrams for connecting motors, smoke detectors, and heat detectors.
Wiring instructions for RWA push-buttons (HSE) and fire buttons.
Wiring for ventilation push-buttons, rain sensors, and wind wheels.
Wiring the weather station to the control unit.
Configuring relay outputs for alarm and error status retransmission.
Connecting multiple RWA compact control units together for increased capacity.
Connecting multiple control units via alarm lines using terminal resistors.
Installing interface modules for BKS-NET communication over longer distances.
Establishing connections between control units using the BKS-NET interface.
Connecting key switches and input/output modules for central control.
Wiring diagrams for key switches (ST10/ST20) and IO10 modules.
Essential safety precautions to be taken before operating the system.
Overview of manual signalling devices (RWA push-button HSE) and their indicators.
Details on LED indicators and push-button functions for ventilation.
Indicator LEDs and operational modes for the ST10/ST20 key switch.
Identification of internal push-buttons, DIP switches, potentiometers, and jumpers.
Detailed functional descriptions for all LEDs on the control unit board.
Alarm relay functions and push-button operations like emergency CLOSE.
Configuration options using DIP switches and potentiometers for various functions.
Procedure for initial start-up and configuration of the BKS-NET bus system.
Safety precautions to observe during system operation.
Using the unit for daily ventilation with OPEN, CLOSE, and STOP functions.
Activating the function to close drives during a power failure.
Limiting the duration of drive actuation in the OPEN direction.
Automatic closing of manually opened windows after a set time.
Using rain and wind sensors to control ventilation functions.
Managing alarms, acoustic signalling, and resetting the system.
Safety instructions for performing maintenance and cleaning tasks.
Guidelines for system inspection, battery replacement, and smoke detector replacement.
Procedures for resetting maintenance and battery replacement indicators.
Procedure to reset the control unit to its original delivery condition.
Instructions for safely cleaning the housing of the control unit.
Details regarding the guarantee and warranty coverage for the product.
Safety instructions to follow before decommissioning and disposing of the unit.
Guidelines for disposing of the unit, accessories, and batteries as electronic waste.
List of regulations and standards considered in the design and manufacturing process.
Details of the TÜV Thüringen mark approval certificate and validity.
Diagnosing and resolving faults indicated by LEDs on the unit and push-button.
| Brand | G-U |
|---|---|
| Model | RZ 25 |
| Category | Control Unit |
| Language | English |