AThe fence line starts under the charging station, wiring in the anticlockwise direction along
the
lawn edge. It ends at the back side of the charging
station.
BThe fence line must pass through the middle of the charging station, and forward at least
2
meters
(
A)
.
CThe slimmest distance of wirings must be at least 1.5 meters interval.
(
B)
.
DThe fence line corner must have an inner angle of at least 125
o
.
EWhen there is a fixing facility or flower and tree in the lawn, isolate it as semi-ring-like
island
or ring-like island with the fence line to avoid any
hit
.
The diameter of the ring-like island is
no more than 1.5meters
FExcept the front 2 meters of the fence line from
the
charging
station, the distance of the rest fence
line
to the lawn edge is
not less than
30cm.
G) Fix the fence line tightly against the ground with the provided pegs. It is recommended
that the pegs are inserted every 2-3 meters. The pegs can be put even closer each other if the
ground elevation differs greatly.
2 mètres

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Gardeo PRO GRO24V20PROG and is the answer not in the manual?

Gardeo PRO GRO24V20PROG Specifications

General IconGeneral
BrandGardeo
ModelPRO GRO24V20PROG
CategoryLawn Mower
LanguageEnglish