EasyManuals Logo

GE AKTAprime plus User Manual

GE AKTAprime plus
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #42 background imageLoading...
Page #42 background image
NOTICE
Do not allow particles to enter the UV flow cell as damage to the
flow cell might occur.
Buffers not containing any salt can be left in the system for a short time after a run, even
overnight (not in the pH electrode, see instructions below).
NOTICE
If a buffer containing salt has been used, the flow path must be
flushed with deionized water.
To flush the flow path:
1
Fill a syringe with five times the sample loop volume of deionized water.
2
Rinse the sample loop by injecting the water through the fill port on the injection
valve.
3
Put all used inlet tubings in water.
4
In the Templates menu, select Application Template and then System Wash Method.
5
Select the used inlet ports. Inlets A1 and B will always be washed.
6
Press OK to start the method. The system flow path is now automatically flushed.
For information on cleaning and long-term storage, see Section5.3 Cleaning, on page46
and Section 5.7 Storage, on page 49.
42 ÄKTAprime plus Operating Instructions 28-9597-89 AB
4 Operation
4.5 Procedures after a run

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE AKTAprime plus and is the answer not in the manual?

GE AKTAprime plus Specifications

General IconGeneral
Pressure Range0 to 5 MPa (0 to 50 bar)
pH Range2 to 12
SoftwareUNICORN
Power Requirements100-240 V, 50/60 Hz
TypeChromatography System
UV Wavelength Range190 to 700 nm
Conductivity Range0.1 to 999.9 mS/cm
Detection MethodUV, Conductivity
Sample Loop Volume5 µl - 5 ml (standard loops)
Pump TypeDual Piston Pump

Related product manuals