Installation
3-19
The system can adapt power supply of AC100V, AC110V, AC115V, AC120V, AC200V,
AC220V, AC230V and AC240V by different connections of the transformer. Before install
the system, please check the power supply voltage range and the transformer
connection per the diagram below.
Wire Transformer taps
11-12
11-12
11-12
3.5.2. UPS Setup
UPS is assembled in back of workstation. Considering safety of shipping, battery is not connected with
power supply.
Follow these steps to setup the UPS.
1. Open the Power Distribution package.
2. Release screws to fixe UPS. Then take out UPS.